Rite Life Sensitometer 394 User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
6
The film selected to monitor a given processor should
be representative of the film used with that processor.
Scheduling Sensitometric Control
Every processor in use should have a separate control
chart plotted to monitor its behavior. The more frequent
the data points, the better the control feedback. A
control film should be run at start-up of the processor
and at least once a day. Use sensitometry whenever
trouble is suspected, or a change has been made to the
process.
Processing Procedure
1. Allow the processor
temperature and
chemistry to reach
equilibrium when starting
up the processor before
processing film.
2. Films should be processed
immediately after being
exposed. Any delay
between exposure and
processing should be
consistent from film to
film.
3. Run a full width film for
cleanup at start-up.
4. Orient the film into the
processor in a consistent
manner— making sure the
film is inserted per
processor manufacturer's
specification.
X-Rite
TIME: DATE: ID NO:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 27 28

Comments to this Manuals

No comments